this has taken me like 5 hours -_-' the bed/crib thing took the longest, then it was the floor.. and so so, blah blah
haha Rate please,
I like it, but i know i few things need Tweeking xD
http://img489.imageshack.us/img489/4280/nursery6dp.png
Printable View
this has taken me like 5 hours -_-' the bed/crib thing took the longest, then it was the floor.. and so so, blah blah
haha Rate please,
I like it, but i know i few things need Tweeking xD
http://img489.imageshack.us/img489/4280/nursery6dp.png
WOO
*IS 1ST ONE 2 POST*
WOW
PURRTY
mm good attempt *thumbs up*
woo 2nd one to post 8/10
Omg i liek totally love it.
cool, 8/10 =] Good attempt, :D
Funky good work
heh Thanks x
6 out of ten alot of stuff looks easy
YeaQuote:
Originally Posted by Mystic-Son
..
w/e
The sofa took about an hour
the cot took the longest
the floor was hard
and the toys alltogether was like 30 mins altogether
and the recolours took 10 mins
>:l
considering its all from scratch [apart from bunny and rug]
I like the floor but the sofa looks like it fused with the wall lol the tebby bear kinda looks funny and recolours always take that long Unless its a duck...Quote:
Originally Posted by lilchloedarlin
Put some habbos in it.
True.....Quote:
Originally Posted by Lynn
i like the horse 10/10 +Rep
O.o I cant draw baby habbos !
x[
!
Nice, 8/10
a phew pixel errors over then that GREAT!!
Its nice yeah, there's some pixel errors around but overall, it's good. 8/10.