Source: http://www.bbc.co.uk/news/uk-england-london-25862543Part of the Victoria London Underground line has been suspended after wet concrete flooded a control room.
Transport for London said the mixture of concrete and water was being used to "fill voids" while upgrade work was being carried out.
Nigel Holness from London Underground said: "We've isolated the cause of it and we're hoping to get the service up and running as quickly as possible."
The line has been suspended between Warren Street and Brixton.
A number of pictures can be found here:
http://usvsth3m.com/post/74285062011...e-is-currently
Well that's bit awkward...








Reply With Quote



It's so simple, yet frustratingly for those commuters.



