Discover Habbo's history
Treat yourself with a Secret Santa gift.... of a random Wiki page for you to start exploring Habbo's history!
Happy holidays!
Celebrate with us at Habbox on the hotel, on our Forum and right here!
Join Habbox!
One of us! One of us! Click here to see the roles you could take as part of the Habbox community!


Page 1 of 2 12 LastLast
Results 1 to 10 of 12
  1. #1
    Join Date
    Feb 2006
    Posts
    24,818
    Tokens
    63,690
    Habbo
    FlyingJesus

    Latest Awards:

    Default French rail operator orders trains too big to use

    http://www.theguardian.com/world/201...trains-too-big

    One in six of the regional stations these superb new trains are suppose to service won't be able to house them (the first time at least...) because the distance between track and platform wasn't calculated properly. 2,000 of these new trains have been ordered and because they're bloody expensive it's going to cheaper for them to slice bits off the platform than change the order - but it's gonna cost them a projected 50,000,000 Euros to fix the 1,300 platforms that somehow got overlooked.

    Apparently in some places they're too wide for two to go past each other, amazing
    | TWITTER |



    Blessed be
    + * + * + * +

  2. #2
    Join Date
    Dec 2011
    Posts
    1,709
    Tokens
    7,415

    Latest Awards:

    Default

    i wonder who overlooked this

    and how they feel rn

  3. #3
    Join Date
    Jul 2012
    Location
    UK
    Posts
    6,226
    Tokens
    325
    Habbo
    Zitrone

    Latest Awards:

    Default

    hahaha yes saw this on bbc or daily mail yesterday HILARIOUS

  4. #4
    Join Date
    Mar 2005
    Location
    Bristol
    Posts
    5,642
    Tokens
    12,065
    Habbo
    djclune

    Latest Awards:

    Default

    Quote Originally Posted by Futz View Post
    i wonder who overlooked this

    and how they feel rn
    I imagine they're currently handing out their CV.

    Such a ridiculous error to make haha, you would expect there to be multiple checks made by different people before the order was placed so I can't fathom how this managed to happen.
    That's when Ron vanished, came back speaking Spanish
    Lavish habits, two rings, twenty carats

  5. #5
    Join Date
    Jul 2004
    Location
    UK
    Posts
    23,590
    Tokens
    33,601
    Habbo
    xxMATTGxx

    Latest Awards:

    Default

    What a nightmare that is going to cause for them. Since they are going to have to change all the stations that these trains will travel to/from to make sure that they can use them. You would have thought they would have checked?


    Previous Habbox Roles
    Co-Owner of Habbox | General Manager | Assistant General Manager (Staff) | Forum Manager | Super Moderator | Forum Moderator

  6. #6
    Join Date
    Feb 2006
    Posts
    24,818
    Tokens
    63,690
    Habbo
    FlyingJesus

    Latest Awards:

    Default

    Supposedly the dimensions given to the train network by the rail network (two different things apparently) were only for the stations that had been built in the last 30 years what kind of absolute moron would think that France has so recently invented rail travel that that's a good enough amount of time to go back sorry that is awful syntax but you get the point someone's had a few too many frog's legs
    | TWITTER |



    Blessed be
    + * + * + * +

  7. #7
    Join Date
    Feb 2008
    Location
    London, UK
    Posts
    15,747
    Tokens
    25,786
    Habbo
    Mr-Trainor

    Latest Awards:

    Default

    I laughed when I first saw this. Shame that the order can't be changed but I guess the cost of altering the platforms will be a good thing in the end since they can benefit from having these bigger trains (more capacity), whether it's marginal or not.

    Not online very often

  8. #8
    Join Date
    Aug 2004
    Location
    Essex
    Posts
    23,585
    Tokens
    9,258

    Latest Awards:

    Default

    Actually this "problem" isn't that bad. Some clever person on reddit calculated that France has over 9,000 platforms of which most can accept the new trains. About 1,300 platforms are not wide enough. The French state-owned train operator calculates it will cost about 80 million euros to shave off the odd few inches on each platform. The cost of the trains is about 3 billion euros, so the cost of righting the platforms is only about 2.5% of the total cost of the trains.

    So in short, it's really not that big a deal as the changes are only a fraction of the cost and are more than affordable. For some reason the news broke out and it was apparently funny, when actually the cost to make all platforms adequate for use is nothing, really.

    Also, the time in which the trains will be delivered is longer than it will take to alter the platforms. So by the time the trains are delivered the platforms will be fine to use.

    EDIT: I think something similar happened with a new Airbus or Boeing a few years ago, and the cost to alter the runways was menial in comparison to the cost of the planes and the increased revenue the airport would receive from accepting the type of plane would cover the alterations in less than a year.
    Last edited by GommeInc; 21-05-2014 at 09:45 PM.

  9. #9
    Join Date
    Jul 2004
    Location
    UK
    Posts
    23,590
    Tokens
    33,601
    Habbo
    xxMATTGxx

    Latest Awards:

    Default

    Quote Originally Posted by GommeInc View Post
    Actually this "problem" isn't that bad. Some clever person on reddit calculated that France has over 9,000 platforms of which most can accept the new trains. About 1,300 platforms are not wide enough. The French state-owned train operator calculates it will cost about 80 million euros to shave off the odd few inches on each platform. The cost of the trains is about 3 billion euros, so the cost of righting the platforms is only about 2.5% of the total cost of the trains.

    So in short, it's really not that big a deal as the changes are only a fraction of the cost and are more than affordable. For some reason the news broke out and it was apparently funny, when actually the cost to make all platforms adequate for use is nothing, really.

    Also, the time in which the trains will be delivered is longer than it will take to alter the platforms. So by the time the trains are delivered the platforms will be fine to use.

    EDIT: I think something similar happened with a new Airbus or Boeing a few years ago, and the cost to alter the runways was menial in comparison to the cost of the planes and the increased revenue the airport would receive from accepting the type of plane would cover the alterations in less than a year.
    Would have been the Airbus A380 - As the taxiways and parking gates were not designed for an aircraft of that size. Many big international airports would the world put the changes in place so they could take it.


    Previous Habbox Roles
    Co-Owner of Habbox | General Manager | Assistant General Manager (Staff) | Forum Manager | Super Moderator | Forum Moderator

  10. #10
    Join Date
    Aug 2004
    Location
    Essex
    Posts
    23,585
    Tokens
    9,258

    Latest Awards:

    Default

    Quote Originally Posted by xxMATTGxx View Post
    Would have been the Airbus A380 - As the taxiways and parking gates were not designed for an aircraft of that size. Many big international airports would the world put the changes in place so they could take it.
    I thought if anyone knew it would be you All I remember was a plane that wasn't right, airports fixed it and the cost wasn't a problem as they made back the money from the increase in passengers or they just used reserved funds.

Page 1 of 2 12 LastLast

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •